Visit www.elgin.gov.uk an up-to-date interactive map of current and planned roadworks in South Gloucestershire.
All current roadworks in the South Gloucestershire area.
A38/B4509. (Falfield)
Temporary traffic management is in place for the signalisation of the junction, and for a junction widening just to the North.
Ward(s) affected:
Charfield
Planned start date:
01 Sep 2008
Estimated completion date:
31 Oct 2008
A4174, Hambrook. (Winterbourne)
Temporary traffic management, (the existing traffic lanes will remain open during the peak hours, although there will be some limited works in the verge during peak periods. To enable the lengthening of the west bound slip roads to Frenchay and Hambrook.
Ward(s) affected:
Winterbourne
Planned start date:
18 Aug 2008
Estimated completion date:
23 Oct 2008
A432 Badminton Road,Chipping Sodbury near Railway Cottages. (Chipping Sodbury)
Two way temporary traffic signals to facilitate new water supply.
Ward(s) affected:
Cotswold Edge
Planned start date:
15 Oct 2008
Estimated completion date:
15 Oct 2008
Along A420 from Kingswood to Grimsbury Road, past Ring Road, along Wraxall Road and Parkwall Road to Bath Road: through Willsbridge Hill and thence towards Keynsham. (Barrs Court, Cadbury Heath, Kingswood, Longwell Green, Warmley, Willsbridge, Keynsham)
In short sections, occasional use of temp. traffic signals or stop-and-go boards during removal of underground cables.
Ward(s) affected:
Hanham, Kings Chase, Longwell Green, Parkwall
Planned start date:
04 Aug 2008
Estimated completion date:
Ongoing
B4061 Alveston Hill, Thornbury, outside Inglenook Cottage. (Thornbury)
Two way temporary traffic signals to facilitate road repair.
Ward(s) affected:
Thornbury South and Alveston
Planned start date:
13 Oct 2008
Estimated completion date:
16 Oct 2008
B4061 Alveston,Thornbury, outside The Chalet. (Thornbury)
Two way temporary traffic signals to facilitate road repair.
Ward(s) affected:
Thornbury South and Alveston
Planned start date:
13 Oct 2088
Estimated completion date:
15 Oct 2008
B4465 Wapley Road, Codrington. (Westerleigh)
Two way temporary traffic signals to facilitate roadworks.
Ward(s) affected:
Cotswold Edge
Planned start date:
06 Oct 2008
Estimated completion date:
24 Oct 2008
B4509 Charfield Road, Tortworth near Elmtree Farm. (Tortworth)
Two way temporary traffic signals to facilitate road repair.
Ward(s) affected:
Charfield
Planned start date:
13 Oct 2008
Estimated completion date:
16 Oct 2008
B4509, outside school entrance. (Tortworth)
Temporary traffic management. To enable signing and lining works to be completed.
Ward(s) affected:
Charfield
Planned start date:
06 Oct 2008
Estimated completion date:
10 Oct 2008
Baden Road, and A420 High Street, Warmley, (between Baden Road and Memorial Park). (Kingswood, Oldland Common, Siston)
Temporary road closure, between (1030hrs and 1045hrs). To enable the holding of the annual Warmley Remeberance Day Parade.
Ward(s) affected:
Parkwall, Siston, Woodstock
Planned start date:
11 Nov 2008
Estimated completion date:
11 Nov 2008
Bath Road, Wick, near A420 London Road junction. (Wick)
Two way temporary traffic signals to facilitate BT works.
Ward(s) affected:
Boyd Valley
Planned start date:
16 Oct 2008
Estimated completion date:
16 Oct 2008
Beaufort Road from its junction with Broad Street to a point 60 metres north. (Kingswood)
Road Closure. To enable building works to be completed. The altenative route is Beaufort Road (part unaffected,Hermitage Road, Victoria Street, Broad Street and vice versa.
Ward(s) affected:
Staple Hill
Planned start date:
04 Feb 2008
Estimated completion date:
31 Oct 2008
Bradley Road, Durban Road and Rodway Road (part). (Patchway)
Temporary road closure (1015hrs to 1115hrs). To enable the holding of the Annual British Legion Poppy Day Parade and Service.
Ward(s) affected:
Patchway
Planned start date:
16 Nov 2008
Estimated completion date:
16 Nov 2008
Broad Street, and High Street. (Kingswood)
Temporary road closure, between (1030hrs amd 1130hrs). To enable the holding of the Royal British Legion, Rememberance Day Parade and Service.
Ward(s) affected:
Staple Hill
Planned start date:
09 Nov 2008
Estimated completion date:
09 Nov 2008
Broad Street, Wickwar Road access to car park, High Street, Hounds Road, Broad Street and (Horse Street to Meads Road). (Chipping Sodbury)
Temporary road closure (1600hrs to 2200hrs). To enable the holding of the annual Victorian Evening. The alternative route is St Johns Way, Cotswold Way and Link Road.
Ward(s) affected:
Chipping Sodbury
Planned start date:
05 Dec 2008
Estimated completion date:
05 Dec 2008
Butt Lane, Thornbury, near Morton Street. (Thornbury)
Two way temporary traffic signals to facilitate road repair.
Ward(s) affected:
Thornbury North
Planned start date:
13 Oct 2008
Estimated completion date:
16 Oct 2008
Castle Street, between High Street and the access road to the Catholic Church. (Thornbury)
Temporary road closure, between (0700hrs and 1700hrs). To enable the holding of a street market. Alternative route - Gloucester Road, Dean Avenue and Park Road.
Ward(s) affected:
Thornbury South and Alveston
Planned start date:
06 Dec 2008
Estimated completion date:
06 Dec 2008
Castle Street, High Street and St Marys Street. (Thornbury)
Road Closure, between (1345hrs and 1430hrs), and between (1530hrs and 1630hrs). To enable the holding of the annual Thornbury Rememberance Day Parade. The alternative route is via Rock Street.
Ward(s) affected:
Thornbury South and Alveston
Planned start date:
09 Nov 2008
Estimated completion date:
09 Nov 2008
Cecil Road, Moravian Road and Regent Street. (Kingswood)
Temporary road closure, between (1430hrs and 1445hrs). The closure is required to hold the annual Kingswood Rememberance Day Parade.
Ward(s) affected:
Woodstock
Planned start date:
09 Nov 2008
Estimated completion date:
09 Nov 2008
Charnhill Drive, near MG Garage/new development. (Mangotsfield)
Temp. signals for water supply.
Ward(s) affected:
Rodway
Planned start date:
10 Oct 2008
Estimated completion date:
10 Oct 2008
Cranleigh Court Road, adjacent to Tyndale Avenue. (Yate)
Temp. signals for water connection.
Ward(s) affected:
Yate Central
Planned start date:
08 Oct 2008
Estimated completion date:
08 Oct 2008
Cribbs Causeway/Passage Road, Conniston Road/Linnet Close, Bevington Close, Bradley Road, Woodlands Lane, Foxfield Avenue/Woodlands Lane, Westfield Way, Foxfield Avenue and Chessel Close/Bowsland Way (Almondsbury, Patchway)
Temporary traffic management. To enable the installation of bus shelters.
Ward(s) affected:
Almondsbury, Bradley Stoke Central and Stoke Lodge, Bradley Stoke North, Patchway
Planned start date:
27 May 2008
Estimated completion date:
Ongoing
Footpath between a point 10m north west of Toghill Lane in a north westerly direction for 160m. (Cold Ashton, Doynton)
Temporary closure of footpath. To enable construction of an access road. The alternative route is, via a specially provided parallel route located about 15m south west of closed section.
Ward(s) affected:
Boyd Valley
Planned start date:
20 Mar 2008
Estimated completion date:
20 Mar 2009
Footpath between A4175/A431 and footpath PBN 66, west of Londonderry Farm. (Bitton)
Temporary closure of footpath. The closure is necessary to enable the construction of a pumpiong station. The alternative route is A4175 footway, footpath PBN 66 and vice versa.
Ward(s) affected:
Bitton
Planned start date:
14 Jul 2008
Estimated completion date:
14 Jan 2009
Forest Road/Footshill Road/Oakfield Road. (Kingswood)
Temporary traffic management to enable kerbing and resurfacing works to be completed.
Ward(s) affected:
Woodstock
Planned start date:
Mar 2008
Estimated completion date:
Ongoing
Gloucester Road B4057, where it crosses over A38 at Patchway viaduct, and adjacent to Highwood Road roundabout. (Patchway)
Temp. traffic signals and one-way working for water main installation and gas main works AND reconstruction of the viaduct.
Ward(s) affected:
Patchway
Planned start date:
01 May 2008
Estimated completion date:
Ongoing
Gloucester Road, A38, at its junction with Charfield Road B4509. This site is close to J14 M5. (Falfield)
Temporary traffic controls, lane restrictions and any other safety measures required to carry out MAJOR junction improvements and installation of PERMANENT traffic signals.
Ward(s) affected:
Charfield, Thornbury North
Planned start date:
19 Jun 2008
Estimated completion date:
31 Oct 2008
Hatchet Road,Brierley Furlong and Great Stoke Way. (Stoke Gifford)
Temporary traffic management. To enable the construction of bus border kerbing and bus shelters.
Ward(s) affected:
Frenchay and Stoke Park, Stoke Gifford
Planned start date:
25 Aug 2008
Estimated completion date:
31 Dec 2008
High Street, o/s 112a. (Marshfield)
Temp. 2-way signals for gas connection.
Ward(s) affected:
Boyd Valley
Planned start date:
16 Oct 2008
Estimated completion date:
16 Oct 2008
High Street. (Thornbury)
Road Closure, between(0930hrs and 2300hrs). To enable the annual Christmas Lights Inaugation Ceremony to take place. The alternative route is Chapel Street, Rock Street, Quakers Street and The Plain.
Ward(s) affected:
Thornbury South and Alveston
Planned start date:
18 Nov 2008
Estimated completion date:
18 Nov 2008
Hill House Road, Downend near North View. (Downend)
Two way temporary traffic signals to facilitate sewer works.
Ward(s) affected:
Downend
Planned start date:
01 Sep 2008
Estimated completion date:
Ongoing
Keynsham Road, A4175, at the bridge over the canal/River Avon, adjacent to the Lock Keeper pub. (Willsbridge, Keynsham)
Minor completion works of repair to bridge.
Ward(s) affected:
Hanham, Longwell Green, Oldland Common, Parkwall, Bitton
Planned start date:
27 May 2008
Estimated completion date:
30 Oct 2008
Lysander Road, that part linking Lysander Road (main road) and Merlin Road. (Cribbs Causeway)
Temp. traffic signals for sewer laying and bridge construction.
Ward(s) affected:
Almondsbury
Planned start date:
27 Oct 2008
Estimated completion date:
05 Dec 2008
Lysander Road. (Almondsbury)
Temporary traffic management. To enable the construction of Bus hardstandings and bus shelters.
Ward(s) affected:
Patchway
Planned start date:
06 Oct 2008
Estimated completion date:
31 Oct 2008
Main Road, B4055, from Easter Compton village towards Pilning. (Easter Compton)
Temp. signals for carriageway repairs.
Ward(s) affected:
Almondsbury
Planned start date:
06 Oct 2008
Estimated completion date:
10 Oct 2008
Malmesbury Road B4040, near junct. Old Down Road. (Old Sodbury)
Temp. signals for weather station construction.
Ward(s) affected:
Cotswold Edge
Planned start date:
09 Oct 2008
Estimated completion date:
13 Oct 2008
Moor lane - Awkley Green Temp Road Closure. Diversion will operate via Hardy Lane and Lower Tockington Road. (Aust, Olveston)
Culvert Replacement Works
Ward(s) affected:
Severn
Planned start date:
29 Sep 2008
Estimated completion date:
22 Dec 2008
Newleaze, Eagles Wood/Woodlands Lane, Trench Lane/Westfield Way and Bradley Stoke Surgery. (Almondsbury, Bradley Stoke, Patchway)
Temporary traffic management. To enable the installation of bus shelters.
Ward(s) affected:
Almondsbury, Bradley Stoke Central and Stoke Lodge, Bradley Stoke North, Patchway
Planned start date:
27 May 2008
Estimated completion date:
Ongoing
Outside 23 Naishcombe Hill, Wick. (Wick)
Two way temporary traffic signals to facilitate new water supply.
Ward(s) affected:
Boyd Valley
Planned start date:
14 Oct 2008
Estimated completion date:
14 Oct 2008
Outside Westgate House, Westerleigh Road, Westerleigh. (Westerleigh)
Two way temporary traffic signals to facilitate new water supply.
Ward(s) affected:
Westerleigh
Planned start date:
14 Oct 2008
Estimated completion date:
14 Oct 2008
Overnhill Road (Downend)
Road Closure. Wessex Water - Installation of Storm Sewer.
Ward(s) affected:
Downend
Planned start date:
01 Sep 2008
Estimated completion date:
30 Nov 2008
Page Road. (Kingswood)
Temporary traffic management. To enable coloured surfacing works to be completed.
Ward(s) affected:
Staple Hill
Planned start date:
06 Oct 2008
Estimated completion date:
Ongoing
Patchway viaduct. (Patchway)
Road Closure. To enable bridge strengthening work to be completed. Alternative north bound route, (heavy vehcles/motorway traffic). Highwood Road,Merlin Road, M5, nort east on M5 then south bound on A38 Gloucester Road. light vehicles and buses/non motorway traffic. Highwood Road, Merlin Road, Lysander Road, A4018 Cribbs Causeway, Wyck Beck Road, Knole Lane, Pen Park Road, N4056 Southmead Road, A38 Gloucester Road North.
(Closure anticipated to be of 10 weeks duration)
Ward(s) affected:
Patchway
Planned start date:
15 Oct 2008
Estimated completion date:
15 Apr 2010
Patchway Viaduct. (Patchway)
Road Closure. To enable bridge strengthening work to be completed. Alternative south bound route. A38 Gloucester Road, A38, U turn at B4057 Gypsy Patch Lane, A38, Highwood Road.(Closure anticipated to be of 10 weeks duration)
Ward(s) affected:
Patchway
Planned start date:
15 Oct 2008
Estimated completion date:
15 Apr 2010
Portland Street. (Kingswood)
Temporary traffic management. To enable the installation of mobility footpath crossings.
Ward(s) affected:
Staple Hill
Planned start date:
01 Oct 2008
Estimated completion date:
31 Oct 2008
Primrose Drive, Thornbury. (Thornbury)
Two way temporary traffic signals to facilitate cable laying.
Ward(s) affected:
Thornbury South and Alveston
Planned start date:
28 Aug 2008
Estimated completion date:
Ongoing
Redhill Lane (B4461), Aust Road and Ingst Road. (Aust)
Caution- Heavy commercial vehicle movements to and from Harnhill Tip, (0800hrs to 1700hrs Monday to Friday).
Ward(s) affected:
Severn
Planned start date:
24 Sep 2008
Estimated completion date:
24 Nov 2008
Rounceval Street at its junction with Culverhill Road. (Chipping Sodbury)
Temporay road closure, (1100hrs to 1110hrs (10minutes)). The closure is required to hold the Chipping Sodbury Slog All Terian Race. The alternative route is Link Road, Kennedy Way, Cotswold Road, or Horse Street, Broad Street, High Street or Hounds Road.
Ward(s) affected:
Chipping Sodbury
Planned start date:
09 Nov 2008
Estimated completion date:
09 Nov 2008
Soundwell Road, Soundwell. Outside Bristol Water Depot near garage. (Kingswood, Soundwell)
Main Laying eventually going through the four way lights. Traffic control manned working outside traffic sensitive hours.
Ward(s) affected:
Kings Chase
Planned start date:
23 Sep 2008
Estimated completion date:
13 Jan 2009
Station Road, A4175, between Hot Water Lane and Chiphouse Road. (Kingswood)
Temporary three-way traffic signals at junctions, and two-way on straight, for main sewer replacement.
Ward(s) affected:
Rodway, Siston, Staple Hill
Planned start date:
01 Sep 2008
Estimated completion date:
Oct 2008
The Causeway, at Hillside House. (Coalpit Heath)
Temp. signals for power cable.
Ward(s) affected:
Frampton Cotterell, Westerleigh
Planned start date:
30 Oct 2008
Estimated completion date:
12 Nov 2008
The Square. (Alveston)
This minor road will be closed for gas main laying.
Ward(s) affected:
Thornbury South and Alveston
Planned start date:
22 Sep 2008
Estimated completion date:
17 Oct 2008
Westerleigh Road, from Coalsack Lane to Folly Brook Road. (Mangotsfield, Westerleigh)
Temporary traffic management. to enable bridge maintenance work to be completed. The alternative route is Westerleigh Road (part unaffected), A4174, A432 Badminton Road, A432 Station Road, A432 Kennedy Way, A432 Cotswold Way, A432 Badminton Road, A46 Bath Road, B4465 Wapley Road, Westerleigh Road (part unaffected) and vice versa.
Ward(s) affected:
Emersons Green, Westerleigh
Planned start date:
25 Mar 2008
Estimated completion date:
Ongoing
Westerleigh Road, from St Briavels Drive to Rodford Way. (Yate)
Temporary traffic management. To enable the installation of bus border kerbing.
Ward(s) affected:
Yate Central
Planned start date:
15 Sep 2008
Estimated completion date:
31 Oct 2008
Wickwar Road/Southfield Way. (Yate)
Temporary rtraffic management to enable street lighting works to be completed.
Ward(s) affected:
Chipping Sodbury
Planned start date:
Apr 2008
Estimated completion date:
Ongoing
|
|